Update*
Hi everyone. Just a quick update to keep everyone informed. There have been some exciting developments on the manufacturing side.
All of the CNC'd parts are now either finished, or in QC!
I finally got the boards finished the other day and I'm in the process of getting all the Tri-Rings made for the run. These are all hand made too, so like the boards, they take time. Nearly done though and moving on to the stainless ones.
The body sections have been returned to the machine shop to have a final process applied. This is in progress as we speak (in the UK) and should only take a couple of days.
I've received the ISYHCANL boxes and they look great! On the previous run, I hadn't added a deep enough countersink, so this had to be increased by hand before they could be sent out. This has been fixed this time around, and they look great.
The Hero and Yuma boxes are finished and in quality control, so should be on their way to me soon.
The Hero plates are also finished and in QC. This is great news as I need a couple of these to complete the triangles. In order to get the triangles to a uniform height, I use two of the plates, sandwiched together to hold the triangles while sanding/polishing. So I'm looking forward to receiving those.
The
slothfurnace cards arrived (thanks Brad!). So that's everything covered now.
Still to do:
- Brass rails (cut to length)
- T Profiles (trim central strut and cut to length)
- Black Buttons (cut to length and add detail)
I've received all the necessary materials for the above.
My regular freelance work has gone down to two days per week for now, so I'll be putting full days in to getting everything tied up now (Mon/Tue/We'd)
Very excited that everything seems to be coming together. I wouldn't like to put a date on things, but it's certainly looking like kits will be getting shipped out to everyone soon.
Thanks again to everyone who's placed their trust in me and helped to make this run happen!
As always, I'll keep you updated with any developments.
All the best and MTFBWY.