giuliodondi
New Member
In 2019 I built the Zvezda 1:2700 ISD kit, my first kit built since my teenage years. That kit would be my first try at fiber optics lighting.
It was supposed to be a one-off endeavour to make a nice home showpiece, so no build log as well as corners cut left and right (impatient me).
This thread is about the second attempt, with a lot more attention to detail. So I'd like to start the build log by showing the previous attempt and list all the things I was going to improve on.
- Since the ISD is meant to be a grey triangle, I thought I could get away with coating everything with grey primer and calling it a day. No panelling, highlighting of details, weathering etc..
- I used a primer not meant for modelling and I put way too many coats to try to make everything uniform. Lots of detail lost in the process
- No kitbashing or detailing whatsoever, except a very sorry afterthought attempt in the rear trench recess
- Used 0.75mm fiber optics, too big for this scale, and in a few places they're not placed uniformly
- trench and hangar bay LEDs are too bright
- An accident on one of the superstructure roofs badly re-touched, more lost detail
- The seam between the two hull sections was filled with thick acrylic paint and painted over, as opposed to putty and masked with greeblies. Looks poor and it also catches dust more than the surroundings
- The display can use some improvement. I like the underside mirror thing, but the triple stilts look janky
The second build began in October 2020 as a Covid lockdown project. Now, in July 2025, it's coming along nicely but nowhere near finished. In the following posts I'll showcase all the pictures I collected in the meantime
It was supposed to be a one-off endeavour to make a nice home showpiece, so no build log as well as corners cut left and right (impatient me).
This thread is about the second attempt, with a lot more attention to detail. So I'd like to start the build log by showing the previous attempt and list all the things I was going to improve on.
- Since the ISD is meant to be a grey triangle, I thought I could get away with coating everything with grey primer and calling it a day. No panelling, highlighting of details, weathering etc..
- I used a primer not meant for modelling and I put way too many coats to try to make everything uniform. Lots of detail lost in the process
- No kitbashing or detailing whatsoever, except a very sorry afterthought attempt in the rear trench recess
- Used 0.75mm fiber optics, too big for this scale, and in a few places they're not placed uniformly
- trench and hangar bay LEDs are too bright
- An accident on one of the superstructure roofs badly re-touched, more lost detail
- The seam between the two hull sections was filled with thick acrylic paint and painted over, as opposed to putty and masked with greeblies. Looks poor and it also catches dust more than the surroundings
- The display can use some improvement. I like the underside mirror thing, but the triple stilts look janky
The second build began in October 2020 as a Covid lockdown project. Now, in July 2025, it's coming along nicely but nowhere near finished. In the following posts I'll showcase all the pictures I collected in the meantime