Thanks!
Got to wrapping up puttying/sanding/painting the last six large structures of the main port. Started to work up a sample of the smaller inner structures (12 needed). Hadn't taken a bottom tunnel shot in a while...
Got to wrapping up puttying/sanding/painting the last six large structures of the main port. Started to work up a sample of the smaller inner structures (12 needed). Hadn't taken a bottom tunnel shot in a while...
Last edited: