Death Star 2 Port Attack Diorama

OTnROTSfan

Well-Known Member
RPF PREMIUM MEMBER
Thanks!

Got to wrapping up puttying/sanding/painting the last six large structures of the main port. Started to work up a sample of the smaller inner structures (12 needed). Hadn't taken a bottom tunnel shot in a while...
 
Last edited:

OTnROTSfan

Well-Known Member
RPF PREMIUM MEMBER
Thanks guys. Hopefully some more progress next weekend. Might try to whip out a few of the inner port structures. I thought about moving onto the surface for the fun of it, but I still need the full port to fit all together and then massage the final hole size it fits into...
 

OTnROTSfan

Well-Known Member
RPF PREMIUM MEMBER
Yeah, sorry for lack of updates... Barely have had time to pop on and check what's going on (as you can see how long it took me to respond). Crazy work/travel/event stretch since Feb. I finally have a few upcoming weekends at home soon, so will pick up slowly again. Next step is to finish cutting all the parts for the inner port structures. Those should be easier to make than the outer ones.
 

OTnROTSfan

Well-Known Member
RPF PREMIUM MEMBER
Sooooooo....... Have been on a build 4 months, not build 4 months, build 4 months schedule... have some time off (finally), so making some progress again. Hopefully this starts another 4 months of building...

Here's where we left off...
DS2_Build281_sm.jpg


So, first progress in a LONG time... :$ I got all the core parts for the 12 inner structures cut in the last two days...

DS2_Build286_sm.jpg
 

Fuzzual

Sr Member
RPF PREMIUM MEMBER
DUDE!!! I am sooooooooo excited to see you are back on the project. Excellent as always. (sorry, not stalking you, just love the project:unsure:lol)
 

OTnROTSfan

Well-Known Member
RPF PREMIUM MEMBER
Thanks. Got the inner port grids cut, clipped, sanded... basically done. Always fun to sand with all the little burrs, flash, and stringy edges. Started putting together inner port frames (nothing sexy to show, yet)... next up.

DS2_Build287_sm.jpg
 

OTnROTSfan

Well-Known Member
RPF PREMIUM MEMBER
Got the first three of twelve of the inner structures framed up and temporarily tacked in place to do some positioning tests...

DS2_Build292_sm.jpg


DS2_Build294_sm.jpg
 

Your message may be considered spam for the following reasons:

  1. Your new thread title is very short, and likely is unhelpful.
  2. Your reply is very short and likely does not add anything to the thread.
  3. Your reply is very long and likely does not add anything to the thread.
  4. It is very likely that it does not need any further discussion and thus bumping it serves no purpose.
  5. Your message is mostly quotes or spoilers.
  6. Your reply has occurred very quickly after a previous reply and likely does not add anything to the thread.
  7. This thread is locked.
Top