1/9th Scale Jaws Orca (NECA Size)

20241126_205113.jpg
20241126_205151.jpg
 
The flying bridge is done, it has to be weathered and I can add all the bits. I found the M1 ammo crate with all its markings. The lights are all hooked up and working. The electrical wires leading from the hull to the bridge have to be shortened, I'll do that just before I permanently glue the bridge to the roof and finish the forward cabin. I may have to remove the tube that hides the wires in order to build the forward cabin. So, next on the list are the cabins. I've been fiddling with the wall so I can mount the door. The cabins will be fun to build, but it's good to be long and tedious work. I know I'll have to build it and be able to remove parts of it so I can add balast weight to the bow. I'm figuring 6 to 8 pounds to get her to the correct water line.
20241214_212923.jpg
20241214_212546.jpg
20241214_212434.jpg
20241214_212648.jpg
 
Sorry I haven't been on building. We had a medical setback in the family. Haven't really been building per say, but trying to figure out how tall the storage bins are compared to the windows and barrels.
A big thank you to Bloop for designing his Mayor Vaughn head, what a great addition to your Jaws Chief Brody head! Can't wait to see what Ellen Brody will look like!
20250124_152614.jpg
Screenshot_20250124-085917_Instagram.jpg
 
Back
Top