Limited Run SaberBay DARKSABER season 3 finish now available (limited quantities) saberbay.com

what are the gauges on those wires as well? is it the same as the hilt side (22, 26, 26)?
I'm not sure. I'm cannibalizing an electronics kit I already had.


Ok, so is this good?
Blade:
0422231733.jpg


Hilt:
0422231436.jpg
 
Last edited:
Anyone have a picture of how the switch is supposed to be wired?
View attachment 1694994
View attachment 1694995
View attachment 1694996

Is your red wire going to both Com and Din? I don't think you'll want that. Din is data for pixels which it looks like you aren't using. Com is for the buttons.

Sorry, I got carried away when building last night and didn't take any pictures. I really wish I had taken a good picture of the Proffieboard adapter because I had a surprising amount of trouble figuring out how that needed to be oriented. Took me a frustratingly long time to get it.
 
Is your red wire going to both Com and Din? I don't think you'll want that. Din is data for pixels which it looks like you aren't using. Com is for the buttons.

Sorry, I got carried away when building last night and didn't take any pictures. I really wish I had taken a good picture of the Proffieboard adapter because I had a surprising amount of trouble figuring out how that needed to be oriented. Took me a frustratingly long time to get it.
So do I only use the Com, 1, and 2 pads?
 
So do I only use the Com, 1, and 2 pads?
Do you want to use the pixels, which can change colors, or just the white LEDs? If you aren't using the pixels, you don't need to worry about Din. Just Com to GND, 1 and 2 to button pads, + to battery, and - to an LED pad.
 
Do you want to use the pixels, which can change colors, or just the white LEDs? If you aren't using the pixels, you don't need to worry about Din. Just Com to GND, 1 and 2 to button pads, + to battery, and - to an LED pad.
I figured just the white ones. I don't plan to change colors and hopefully it's simpler that way.
 
20 Cfx builds getting shipped to me this week.
The profile is builds getting shipped within next 7-10 days hopefully.
I will need 3 days to do QI the I will back them with their blades and ship.
Don’t even have to QC mine just forward it right along lol. Jokes aside, I’m super excited, and I’m sure many others are.
 
Back
Top