So, here's where R2-CE stands. His new designation based on the initials of the place where I built him.
Dome: Finished. All electronics and parts and paint are final.
Body: Finished. Skins will eventually be taken apart and re-painted/sanded for a smoother finish. Possibly power coated if I can find someone to do it and i can strip off some of the old paint. If I can't make these look good, I'll just bite the bullet and order a new set. I know what I'm doing now.
Legs: Upper Leg completed. Metal UnderShoulder details still to be shipped. New metal leg hydraulics installed. Horse Shoe will be replaced with BC Compliant Alum.
Feet: Basically all done. Motors are installed. new Metal Knurlled fittings will arrive this week. Metal Battery Harness are here. Battery Boxes to be replaced in aluminum.
Ankles: Ankle Details awaiting to be attached. metal Cylinder and wedges will arrive soon. Ankles are last part needing to be bought.
Electronics: Dome lights are done. Dome is set to spin perfectly. The 2X25 is all ready to be wired. Having some trouble getting motor one synched to the remote. Not sure if both motors need to be connected to get it working right.
Still need to work out what i'm going to do with sound.
But other than that, he's almost all done. About 90% done. This time last year, all I had in my possession was the dome

.
One interesting year with a stressful end...