morsesith21
Sr Member
Re: Studio Scale 3 foot Star Destroyer WIP beginning
Continuing to lay out the bottom detailing. This includes the trim that runs down the center of the hull from the main hangar bay to the rear. I also put a temporary dome in place to fill the hole. It will be replaced later.
Continuing to lay out the bottom detailing. This includes the trim that runs down the center of the hull from the main hangar bay to the rear. I also put a temporary dome in place to fill the hole. It will be replaced later.