ESB Active Project Update – Order Confirmation / Shipping Confirmation / Schedule / Optional Labor Services
I have been receiving several emails asking questions that I have covered in multiple emails and post to the main thread.
In the future, if I receive an email with a question that has been answered in this email I will refer you to this email.
PLEASE DO NOT TAKE OFFENCE TO THIS. I am working a lot of over time and this time of year I am very busy around the house and yard so my spare time is very limited.
ORDER CONFIRMATION SHIPPING
Prior to shipping your order I will send you a “confirmation email”
In that email I will list all of the items that I am holding for you and the cost and method of shipping.
It is VERY important that you make sure everything you paid for is listed in that email.
I just incurred a $40 expense that was caused by 3 mistakes.
I originally invoice the member for a Hoth Scope Bracket Disk instead of a Hoth Scope Bracket. The member did not catch it on the original invoice which I ask everyone to confirm prior to paying. Then the member missed the same issue on the “shipping confirmation” email. It is an international order so the shipping is a big factor in the loss and Because they did not explain a customs issue with priority mail they incurred a $25 fee that could have been avoided by using First Class.
SHIPPING CONFIRMATION
I receive a lot of emails about address changes.
Your final invoice will be paid via PayPal so as long as your then current PayPal Address is correct you will not need to notify me about address changes. I always ship to the confirmed PayPal address , except in rare situations.
PROJECT SCHEDULE
I have covered this several times but I still get emails about this
The completion schedule is as follow
- Scope machining – This has been delayed because the metal the scopes were cast from is very “sticky” which makes it hard to machine. The original fixture concept was scrapped because they do not thing it was strong enough to hold the scope during the machining process. They are going to create a new fixture next week and they should be ready to machine the “feet” next weekend. Then they have to machine the front and back of the scope for the leses and lens rings. They also have to machine the lens rings and light sockets. So this process may take 3-4 weeks
- Denix Mauser Machining – Once the scopes are done they will machine the mausers and this process normally takes 2-4 weeks to complete
- Resin Parts – During the Mauser machining process I am going to ask everyone to let me know which resin parts they want. I will not ask you to pay for the resin parts until I invoice you for the shipping and optional labor services which will be when I am ready to ship your kit.
OPTIONAL LABOR SERVICES
Every project I do I create a menu of inexpensive optional labor services which will run the gamut from removing the front sight to full builds. THESE ARE OPTIONAL. I do them work in the order that get the most kits out the fastest so if you want a full build you will be in the last group shipped. I do this so I can dedicate my full attention to the more complicated builds. I hope this makes sense to everyone that wants full builds.