steve neill
Sr Member
Lots of time in the edit bay today on the movie and our weekly show which is 40 minutes this time with lots of cool stuff. It will be uploaded by the morning.
I also got lots done on the big TOS E. Wet primer on the top of the saucer, bridge hull has the windows and light positions cut out. All windows and lights cut out and filed on the lower saucer section. Next up to do the few lighting openings on the upper saucer section and open up all the windows on the engineering section.
To reiterate what this all is this a the large TOS Enterprise made from my original molds for the Museum of Science Fiction in Washington DC.
If you want to get your name on the plague as a contributor you can donate to this non profit build at: http://www.steveneillsgarage.com/donations66-tos-museum-of-…
I want to thanks everyone for the donations to date your are greatly appreciated!
I also got lots done on the big TOS E. Wet primer on the top of the saucer, bridge hull has the windows and light positions cut out. All windows and lights cut out and filed on the lower saucer section. Next up to do the few lighting openings on the upper saucer section and open up all the windows on the engineering section.
To reiterate what this all is this a the large TOS Enterprise made from my original molds for the Museum of Science Fiction in Washington DC.
If you want to get your name on the plague as a contributor you can donate to this non profit build at: http://www.steveneillsgarage.com/donations66-tos-museum-of-…
I want to thanks everyone for the donations to date your are greatly appreciated!
Last edited by a moderator: