NemVia
Well-Known Member
June Updates - 2015 Hey Everyone!
It's good to be back! We just came back from a week long cruise to the BAHAMAS! A much needed and relaxing vaca! Enough to recharge batteries and enthusiasm to get back to the task at hand.
Anyway, I was going to set up the June updates before I left, but I ran out of time, so here we go....
I needed to wait for some other parts for the model so I had to divide my time on working on the gangway/interface/armature and the port side detailing on the panel frames.
I first had to feed all of the wiring through the armature and feed it up to the top of the armature so I could add the gangway and tower details around the wiring. This will hide all of the wiring and make it appear as though the ship is under it's own power. I built the gangway on this version of the model the same way I did it for the 1/350 scale version of the model. I first started at the hull of the saucer section and work my way out to the tower section then build the actual tower section on three sides and detail it. By only building it up on three sides allows me to add any last minute additional wiring that might be needed. When I'm sure I won't need to add anything I can then seal all of the wiring in and paint all of the details. I was also able to add the three hydraulic lines that are seen in the movie. I used an enhanced screen cap to follow how these lines hang on the sides of the gangway.
In other areas I've added the lower tier mark lights as well as the port side mooring tractor beam turrets. So more soldering and wiring were needed. Also, I began working on the tension rod assemblies for the port side panel frames. I started with the mounting nuts then added the washers and bolts then cement the turnbuckles into place. Next I cement only one end of the tension rod into one end of the turnbuckle and leave the other end to slide in and out of the turnbuckle. This helps keep the rods from bending when I assemble the panel frames to the overhead modules when the weight of the structure shifts.
The last pieces I've worked on in the last month are the outside panels that are seen when the Enterprise takes off from the Dock. I just added some small details. I put some c-channel pieces as well as some tanks on either side of the c-channels. I will be adding an LED to each of these panels later on to add some more lighting effects to the outside of the panel frames. Well, now that vacation is over with, it's back to work on all counts! Enjoy the pics in which there are 12 new ones on the Updates for June - 2015 page! See you in a month!
Mark
It's good to be back! We just came back from a week long cruise to the BAHAMAS! A much needed and relaxing vaca! Enough to recharge batteries and enthusiasm to get back to the task at hand.
Anyway, I was going to set up the June updates before I left, but I ran out of time, so here we go....
I needed to wait for some other parts for the model so I had to divide my time on working on the gangway/interface/armature and the port side detailing on the panel frames.
I first had to feed all of the wiring through the armature and feed it up to the top of the armature so I could add the gangway and tower details around the wiring. This will hide all of the wiring and make it appear as though the ship is under it's own power. I built the gangway on this version of the model the same way I did it for the 1/350 scale version of the model. I first started at the hull of the saucer section and work my way out to the tower section then build the actual tower section on three sides and detail it. By only building it up on three sides allows me to add any last minute additional wiring that might be needed. When I'm sure I won't need to add anything I can then seal all of the wiring in and paint all of the details. I was also able to add the three hydraulic lines that are seen in the movie. I used an enhanced screen cap to follow how these lines hang on the sides of the gangway.
In other areas I've added the lower tier mark lights as well as the port side mooring tractor beam turrets. So more soldering and wiring were needed. Also, I began working on the tension rod assemblies for the port side panel frames. I started with the mounting nuts then added the washers and bolts then cement the turnbuckles into place. Next I cement only one end of the tension rod into one end of the turnbuckle and leave the other end to slide in and out of the turnbuckle. This helps keep the rods from bending when I assemble the panel frames to the overhead modules when the weight of the structure shifts.
The last pieces I've worked on in the last month are the outside panels that are seen when the Enterprise takes off from the Dock. I just added some small details. I put some c-channel pieces as well as some tanks on either side of the c-channels. I will be adding an LED to each of these panels later on to add some more lighting effects to the outside of the panel frames. Well, now that vacation is over with, it's back to work on all counts! Enjoy the pics in which there are 12 new ones on the Updates for June - 2015 page! See you in a month!
Mark
Attachments
Last edited: