Portumac
Well-Known Member
Hi, I been at my local machine shop organizing all the parts that are already made and I been assembling the parts on the 3D printed Bowcaster frame. Here are some pictures of the first Bowcaster frame in the CNC machine after all the changes were made in the step files. It should be machined by Friday before they can do the pocket for the trigger and then all the holes drilled and tapped. According to the owner of the machine shop, it will take two to three days to fully machine a frame. I would like to paint and assemble at least 5 at at time. It will be better to do all once they are done, but I don't want to keep you guys waiting much longer. I am very very pleased how stunning the parts came out. Even the single point scope in the middle came out even better than the original, no bubbles or imperfections trapped inside the acrylic piece. Notice that the scopes are hollow and not solid like the original. Here are some pictures. I will take pictures of the slings too. I will be posting more pictures over the weekend. Please don't hesitate to contact me if you guys have any questions. Thank you again for your patience.
Attachments
-
IMG_5747.jpg96.8 KB · Views: 69
-
IMG_5773.jpg100.5 KB · Views: 60
-
IMG_5774.jpg47.9 KB · Views: 70
-
IMG_5775.jpg79.6 KB · Views: 62
-
IMG_5776.jpg74.1 KB · Views: 59
-
IMG_5777.jpg46.8 KB · Views: 56
-
IMG_5778.jpg28.6 KB · Views: 65
-
IMG_5779.jpg29.3 KB · Views: 47
-
IMG_5780.jpg82 KB · Views: 54
-
IMG_5781.jpg76.2 KB · Views: 51
-
IMG_5782.jpg225.8 KB · Views: 55
-
IMG_5772.jpg87.6 KB · Views: 73
-
IMG_5771.jpg73.1 KB · Views: 62
-
IMG_5770.jpg148.9 KB · Views: 60
-
IMG_5748.jpg33.7 KB · Views: 61
-
IMG_5753.jpg100.5 KB · Views: 49
-
IMG_5754.jpg101.2 KB · Views: 58
-
IMG_5758.jpg135 KB · Views: 65
-
IMG_5761.jpg52.3 KB · Views: 53
-
IMG_5762.jpg51.2 KB · Views: 59
-
IMG_5763.jpg75.9 KB · Views: 66
-
IMG_5764.jpg49.9 KB · Views: 54
-
IMG_5765.jpg89.5 KB · Views: 56
-
IMG_5768.jpg109.5 KB · Views: 62