Thought you guys might like to see:
I'm disassembling my 1:1 working R2 unit in order to swap out his PVC/sintra chassis (frame) and replace it with an aluminum version. I'm also doing a complete overhaul on the wiring harness and computer system, and replacing all remaining resin detail pieces with aluminum ones. I'll use the sintra chassis for an R5 droid project I am working on.
Pics are at http://www.chrislee.tv/robotics/2006/08/fr...p-underway.html
This is all in preparation for DragonCon in about 3 weeks.
I'm disassembling my 1:1 working R2 unit in order to swap out his PVC/sintra chassis (frame) and replace it with an aluminum version. I'm also doing a complete overhaul on the wiring harness and computer system, and replacing all remaining resin detail pieces with aluminum ones. I'll use the sintra chassis for an R5 droid project I am working on.
Pics are at http://www.chrislee.tv/robotics/2006/08/fr...p-underway.html
This is all in preparation for DragonCon in about 3 weeks.