Almost to an item, it seems like every production schedule has been getting delayed for one reason or another. In some cases we have had to remake a tool 5 times and they still can't seem to get it right, no matter how much direction and input we give them.
That being said, it seems like things are finally starting to come together. Updated TIE and Legendary Vader Helmet samples arrived this week and look good. Full scale production should be taking place very soon. It's likely we could have 2 to 3 items shipping out of China in August.
-----
Well, the Legendary will be done first and actually they are pretty far along at this point. All of the approvals have gone smoothly and in fact all of the samples have been spot on. It's a pretty rare thing, but if everything goes smoothly with a project it can go very fast. And we held off on the pre-order of that one for quite a while, so it was a little further along to begin with.
The nice thing is there is no tooling involved with the Vader Helmet. And the molds are from the original pattern, so it's really just a matter of getting the paint correct. And that's actually been more or less perfect on the samples.
Unlike the TIE that has a ton of tooling with really detailed undercuts. It is progressing but each tool can take up to 12 weeks to complete. The latest sample looks good and should get in full production very soon.
The Luke Reveal is going fine. The machining of the parts is what is going to drag the schedule a bit, but the first batch should ship by August if not sooner.
The X-Wing Helmet would have been done 6 months ago if not for the visor tooling errors. The factory had it remade 5 times and still it wasn't right. So plan-G is going ahead to get that finished.
So all in all things are getting closer than ever to completion. Even the Nautilus will be done by late August or early September if the current schedule holds.