This one has taken about 6 months. I should have it done in a week or so and then it's off to it's new home up northeast.
The greatest highlight of this build has to be the new exterior lighting system. This is an LED Neon based system and man, it's bright. Totally blows my old EL wire system out of the water.
I still have a few minor hoses and details to finish up here and there, but I should have this one done and off to it's new owner in a day or two.
Then I can get back to rebuilding my own BTTF-D
-Gary
The greatest highlight of this build has to be the new exterior lighting system. This is an LED Neon based system and man, it's bright. Totally blows my old EL wire system out of the water.
I still have a few minor hoses and details to finish up here and there, but I should have this one done and off to it's new owner in a day or two.
Then I can get back to rebuilding my own BTTF-D
-Gary