Limited Run Han Solo ROTJ Blaster Active Project

I have added you to the list and updated all records.


This is the last day to get in on this run at the pre-order price
 
I have given the final numbers to the machinist and he is ordering the material today :)


Machinists always make a percentage over what you order to cover damaged parts and I ordered a couple extra sets but since the preorder phase is over the cost for a complete set of parts is now set at $280


You can order a set if you still want to get in on this run
 
Any of you guys JJ Abrams / Disney spies? If so, use this blaster for the new movie so I don't have to do an ep7 solo blaster.
 
I just updated the list by adding a sub list of members that requested to have their mausers held to be shipped with these parts.

Please check the lists to make confirm my records

Thanks
 
I just updated the list by adding a sub list of members that requested to have their mausers held to be shipped with these parts.

Please check the lists to make confirm my records

Thanks

Please put my member name in the list instead of name and surname! Thanks!:D

Just to clarify, all 4 with their respective wooden handles and brass screws:

1 denix mauser to be assembled and machined! 1 to be left untouched: To be hold!

1 denix mauser+the MCG mauser untouched to be sent to our fellow forumer!

Regards,

Alberto
 
Please put my member name in the list instead of name and surname! Thanks!:D

Just to clarify, all 4 with their respective wooden handles and brass screws:

1 denix mauser to be assembled and machined! 1 to be left untouched: To be hold!

1 denix mauser+the MCG mauser untouched to be sent to our fellow forumer!

Regards,

Alberto



Sorry about that I had the info switchec on my list. I also have all of your details recorded. I'm just waiting on the machinist to finish his work on the milled details so he can return the MGC to me.
 
I have received several emails about the milled detail sub project, how it's going to work, etc.

QUICK ANSWER: You will be able to send me your lower (or the whole Denix) and I will hold anything you have ordered and re-ship it back to you once everything is done.

LONG ANSWER:

The machinist has a new Denix and an MGC from my previous run with milled details. He going to write the code to do the mill work and he is going to remove the Denix Logo and send both units back to me for evaluation.

Once I have the sample part I am going to post an interest thread to see if other people are interested in just the Denix Logo Removal Service. This will help reduce the cost for everyone

Here is a list of what I want the machinist to do for the ROTJ Denix Mausers

Remove the Denix Logo

  • Cut all 4 milled details on the left side
  • Drill the 2 holes for the pistons on the left side
  • Drill the single hole for the piston on the right side
  • Drill and tap the 2 holes for the scope bracket.
  • Remove the Safety lever
  • If all goes as planned this kit will take a few minutes to bolt it together, all of the holes will be drilled and tapped if required.



If all goes as planned this kit will take a few minutes to bolt it together, all of the holes will be drilled and tapped if required.
 
Last edited:
I'm new here, so pardon my ignorance. It seems I'm a little late to the party, is it still possible to get in on this run?
Edit:
Sorry, just read the 4/29 edit. I'd like just the muzzle, is there modified pricing for single items?
 
Last edited:
Yes, but you are not eligible for the pre-order prices of $254, instead the price for the few extra parts sets I bought is $280
 
I spoke with my machinist todays and he gave me some preliminary time tables for the parts.

He should have the prototype mauser with the Denix logo removed by next Monday so I should have it by the middle of the week.

Once I have that I will start and interest thread for Denix Logo Removal service.

I will also know approximately how much it will cost to do the additional milling for our ROTJ project.

I intend to have the machinist mill the details and drill / tap all the hoe required to mount the scope bracket and pistons.

He also told me that his project date of completion for the kit parts is June 1st :)

So lets hope he doesn’t have any issues or delays


Thanks
 
Yes, I had a couple extra mausers set aside for this.

I have received your payment and updated all of my lists.

Thanks
 
I had my machinist remove the Denix Logo from a Lower.

This is a crucial step for this project because the logo must be removed prior to milling the details in that pocket


I will also offer the Logo Removal Service to anyone that need their logo removed.

I should have pricing for this by this week end and will post a separate Interest Thread for that service.
 
Back
Top