NemVia
Well-Known Member
JUNE UPDATES - 2018 My Apologies everyone, Mom passed away in March so My Wife and I have been busy taking care of the related matters. But everything has calmed down now so I was able to start up again on the drydock. I left off on adding the Black velvet to the display base of the model. I was able to finish this plus add some support screws for the light panel frame assembly. These will help keep the frames from swaying and sagging. With the Enterprise touched up I was able to add it permanently to the dock. The ship is now locked into place with two screws. The ship is now free floating inside the structure. I also began running all of the wiring from the ship up the through the armature structure. As soon as I add the travel pod docking pod to the outside of the dock I can then seal up the armature arm and paint it to look like the rest of the dock. Now comes the painful part of the assembly where I have to add the port side panel frame assembly. In order to make it fit around the armature support arm I had to cut into two of the panel frames. This unfortunately weakens the structure a bit until I can re-support the frames so they won't sag. I also had to secure all of the frames to the overhead modules via some lock-nuts screws and dome nuts. It took a while to adjust everything together, but now the Enterprise is completely surrounded by the dock. Next I will be testing all of the wiring to make sure everything lights up. I've also taken all of the work-cranes and lights out and will soon be adding them to the structure. Then of course they all have to be wired in. I have 7 new pics in the June Updates - 2018 page. Don't be alarmed if the panels do not appear strait. I still have to tweak the support frames but at least you'll be able to see a little bit of progress. That's it for this update and it's good to be back. See you soon! http://www.NemVia.net
Last edited by a moderator: