redbutton Sr Member RPF PREMIUM MEMBER Mar 11, 2017 #1 Hi folks, Tom and I are working a ILM casting 3 rd generation. We drilled counter sunk two screws on the control box, drilled out the nipple and drilled for the triangle D ring. Also put a coat pf auto prime on.[H5VIDEO] [/H5VIDEO] Attachments IMG_0650.JPG 379.4 KB · Views: 154
Hi folks, Tom and I are working a ILM casting 3 rd generation. We drilled counter sunk two screws on the control box, drilled out the nipple and drilled for the triangle D ring. Also put a coat pf auto prime on.[H5VIDEO] [/H5VIDEO]
thd9791 Master Member RPF PREMIUM MEMBER Mar 14, 2017 #5 Mods please delete, identical thread on the first page so we don't need this one, but redbutton should post that photo to the sister thread! Last edited by a moderator: Nov 8, 2018
Mods please delete, identical thread on the first page so we don't need this one, but redbutton should post that photo to the sister thread!