DL 44 Blaster
Sr Member
Having the past week off I've spent quite a few hours on this....as in over 8 a day for a week to get this done once and for all.
I've put the final finishing touches on today, doorpads, along with some greeblies onto them. The room may change slightly over time, but this is the finished product as of today.
Come Christmas time I plan on removing the light panels and stringing "rope" style Christmas lights along each pane and securing. All panels will be controlled off the switched outlet when coming into the room. I installed frosted styrene light panels for this future upgrade.
I hope you guys like it. Now I've just got to get mannequins to start displaying my costumes.....ahhh more cash to spend
Steve
[attachmentid=7890] [attachmentid=7887]
[attachmentid=7889] [attachmentid=7888]
[attachmentid=7891]
I've put the final finishing touches on today, doorpads, along with some greeblies onto them. The room may change slightly over time, but this is the finished product as of today.
Come Christmas time I plan on removing the light panels and stringing "rope" style Christmas lights along each pane and securing. All panels will be controlled off the switched outlet when coming into the room. I installed frosted styrene light panels for this future upgrade.
I hope you guys like it. Now I've just got to get mannequins to start displaying my costumes.....ahhh more cash to spend
Steve
[attachmentid=7890] [attachmentid=7887]
[attachmentid=7889] [attachmentid=7888]
[attachmentid=7891]