Exciting news today-first the picture!
The machine shop is completing the second batch of 25 hilts as we speak. He should be done in the next 3-4 weeks.
We should have the finalized 2 tone finish from the anodizer by the end of this week. Lots of anodizing shop required design edits have been necessary for the 3D masking to get it right.
Will post up the pics of the final finish as soon as it’s done.
Once we have the final finish, the anodizer can give us a realistic completion date on the first 25 hilts and a shipping timeline can be determined. Keep in mind the first batch anodizing should be completed in 2 weeks once the final finish is finalized (say that 3 times fast..lol).
Thanks,
Malibu