Polar Lights 1/350 K'T'INGA Build 2019/2020

Top all glued down! Have to decide how much weathering to do on it before final clear coat. Need to put decals on and connect wires to the control board which will be under the center section that will be removable. A few small parts need to be glued on but I will leave that for last. I also have to build a base for it.

20191206_200610smaller.jpg20191209_073733smaller.jpg20191209_073809smaller.jpg20191209_073843smaller.jpg20191209_073958smaller.jpg20191209_074059smaller.jpg20191209_074112smaller.jpg20191209_074119smaller.jpg20191209_074140smaller.jpg20191209_074201smaller.jpg20191209_074209smaller.jpg20191209_074216smaller.jpg20191209_074234smaller.jpg20191209_074343smaller.jpg20191209_074413smaller.jpg
 
This thread is more than 4 years old.

Your message may be considered spam for the following reasons:

  1. This thread hasn't been active in some time. A new post in this thread might not contribute constructively to this discussion after so long.
If you wish to reply despite these issues, check the box below before replying.
Be aware that malicious compliance may result in more severe penalties.
Back
Top