Super Star Destroyer Korbanth 38"

DJSLY

Well-Known Member
RPF PREMIUM MEMBER
Hello to all

Here is a new project, it's the renovation of an SSD that I do for a collector.

The first step was the complete disassembly and a bath of Glanzer to strip paint

before bath


cimg3627.jpg


cimg3628.jpg


cimg3630.jpg



after bath

cimg3710.jpg


cimg3721.jpg


cimg3720.jpg


cimg3811.jpg


cimg3810.jpg



Then I started to drill the holes for the fiber

cimg3812.jpg


cimg3813.jpg



Passage of the optical fiber

cimg4415.jpg


cimg4416.jpg


cimg4418.jpg



I repare the edges of the SSD with styrene

Test lightup

cimg4610.jpg


cimg4611.jpg


cimg4612.jpg


cimg4516.jpg


cimg4517.jpg


cimg4518.jpg


cimg4519.jpg


cimg4520.jpg


cimg4522.jpg
 

Attachments

  • cimg3627.jpg
    cimg3627.jpg
    200.4 KB · Views: 291
Last edited:
Re: SSD Korbanth 38"

Good grief! That's a heck of a lot of work you've put in there!

Brilliant stuff, can't wait for more!

Rich
 
Re: SSD Korbanth 38"

Welcome to the 1/2 mile of fiber club, looking really good!!
I'm on the same build right now, I'm up to around 2000' & over 2500 fiber runs.
 
Re: SSD Korbanth 38"

That's a lot of fiber. And a lot of good work, nice refurb.
 
Re: SSD Korbanth 38"

Thanks to all for the encouragement

I'm on the same build right now, I'm up to around 2000' & over 2500 fiber runs.

I do not know how many holes I drilled, but I drilled a sacred numbers, I know that I used pretty 200/250 meter fiber

Here is the result with the passage of fiber optic deck upper and lower, control station and motors

cimg4910.jpg


cimg4911.jpg


cimg4912.jpg
cimg4913.jpg
cimg4810.jpg
cimg4914.jpg
cimg4915.jpg
cimg4916.jpg
cimg4917.jpg
cimg4918.jpg
cimg4919.jpg
cimg4920.jpg
cimg4921.jpg
cimg4922.jpg
cimg4923.jpg
 

Attachments

  • cimg4910.jpg
    cimg4910.jpg
    84.4 KB · Views: 172
  • cimg4911.jpg
    cimg4911.jpg
    109.9 KB · Views: 200
Re: SSD Korbanth 38"

Thanks Voodoocaster

Edges for the job is not finished, I repair the missing parts by scratching pieces of styrene, the outline that I have realized is used as base to work.


I feed the fibers with ribbon del, I made boxes inside the vessel, the fibers arrive in the box or is disposed del ribbon and diffuses the light.
 
Last edited:
Re: SSD Korbanth 38"

Following the upper deck

cimg4924.jpg


cimg4925.jpg


cimg4926.jpg


cimg4927.jpg
 

Attachments

  • cimg4924.jpg
    cimg4924.jpg
    105.4 KB · Views: 161
Re: SSD Korbanth 38"

The lightup is finished, I'll start building and the paintjob

cimg5010.jpg


cimg5011.jpg


cimg5012.jpg


cimg5013.jpg
 

Attachments

  • cimg5010.jpg
    cimg5010.jpg
    195.9 KB · Views: 180
Re: SSD Korbanth 38"

Great lightning work there,never light a model before,hope I can do as nice as your lightning work when I do:thumbsup

Don
 
Re: SSD Korbanth 38"

Thanks glunark, Talkierg

I started to make the base, while the epoxy glue dry

cimg5014.jpg


cimg5015.jpg
 
Back
Top