![]() |
Replica Props |
Screen Used Props |
Replica Costumes |
Sculpture and Makeup |
General Modeling |
Studio Scale Models |
Movie Discussion |
||
| Collaborate, create, and collect at the internet's largest community dedicated to props, costumes and models. |
|||||||||
|
|
#1 |
|
Studio Half Scale TOS Enterprise Scratch build
I must be crazy but here I go. I've been a modeler, makeup effects and creature man for many moons now. I've worked on everything from Star Trek the Motion Picture to Ghost Busters. But I always wanted to build the Enterprise and have a big model of her. Since I missed the Custom Replicas model I figured why not build one myself.
The technique I'm using is nothing new to Radio controlled airplane builders like myself. I'm using Depron foam sheet in various thicknesses and framing up the geometry of all the basic shapes off the scale plans. Make templates and cut bulkheads and frame them up and sheet them. Now I could do foam wire cutting. CNC. Or balsa construction but this foam sheet is very user friendly and not so messy. Once I have the shapes I glass and epoxy for strength and beating on. All the small details and window reliefs can be added as well as placements for the NAV and other lights that adorn her hull. Once I have all the masters and the smaller parts mastered then I can mold everything in RTV silicone. GI 1000 is my poison of choice. The mother molds will be epoxy glass. Main hull parts and nacelles will be epoxy glass while the other parts such as the Bridge, impulse engines and other such details will be made out of cast Alumilite. Lighting will be LED based and small drive motors in the nacelles to get the warp engine effects. So far I’ve framed up the saucer and I’ve started sheeting it. Here’s some pictures and the constant updates can be found on my Blog. Also check out my website to learn more about this old guy with a kids passion for all things fun, Star Trek and Sci-Fi. Space, submarines, ships, airplanes, yada, yada, yada. More to come, Steve ![]() ![]() ![]() ![]() ![]() ![]()
|
|
|
|
|
|
|
|
|
RPF Sponsors
|
|
|
|
#2 |
|
Join Date: Dec 2001
Posts: 5,067
![]() |
Re: Studio Half Scale TOS Enterprise Scratch build
Sweeet! I can't wait to see this baby when she's done.
|
|
|
|
|
|
#3 |
|
Join Date: Apr 2001
Location: Southern California
Posts: 16,902
![]() ![]() ![]() |
Re: Studio Half Scale TOS Enterprise Scratch build
Welcome aboard! So 5.5 feet?
|
|
|
|
|
|
#4 |
|
Re: Studio Half Scale TOS Enterprise Scratch build
5.5 feet is correct. Thanks guys.
steve |
|
|
|
|
|
|
#5 |
|
Join Date: Dec 2002
Location: Central Ca
Posts: 3,046
![]() |
Re: Studio Half Scale TOS Enterprise Scratch build
I thought I recognized that bench.
I've been to your site before looking at the Gato and Nautilus models. Very nice work. Looking forward to seeing your progress on the E. D6 |
|
|
|
|
|
#6 |
|
Join Date: Jun 2010
Location: Toronto
Posts: 486
![]() |
Re: Studio Half Scale TOS Enterprise Scratch build
Now, this is gonna be another sweet build to follow!
I've always wondered how prop builders think. I'm betting this won't be a slow build as you surely have all the ingredients and kitchen utensils to get a good stew brewing along. That first photo of you with the ship's frame in hand and all the good stuff in the background is some introduction and says it all. And the photos that followed - what technique! You'll be putting on quite a show I'm sure, and I'm happy to be part of the audience. I'm new to the forum myself, but let me greet you a hearty "Welcome aboard!"
|
|
|
|
|
|
#7 |
|
Re: Studio Half Scale TOS Enterprise Scratch build
Wow! Welcome and great to see your project. Which blueprints are you working from? Do you have access to Gary Kerr's?
Karl |
|
|
|
|
|
|
#8 |
|
Join Date: Aug 2007
Location: The Sunshine State
Posts: 1,366
![]() |
Re: Studio Half Scale TOS Enterprise Scratch build
Awesome!!! A project I've always wanted to tackle myself! I love the models in the back-ground as well. Your tastes are very similar to mine
(ok, I see the X-1, Mercury Redstone, XB-70, etc, lol)
|
|
|
|
|
|
#9 |
|
Join Date: Jun 2009
Posts: 243
![]() |
Re: Studio Half Scale TOS Enterprise Scratch build
Welcome to the asylum Steve! You probably won't remember me but I worked with you and Mike Hoover many moons ago on "Honey I Blew Up the Kid"...... Great to have you here!!
|
|
|
|
|
|
#10 |
|
Re: Studio Half Scale TOS Enterprise Scratch build
Give me a name I bet I do. You were working on the Bat boat no?
Feek61 if you want to get a better look at some of my models both scratch and kit builds go to my website. Blue prints. Lets just say they are accurate. I'm a stickler for that. Sometimes I even make my own plans when all else fails. It's so easy to be off on this model and it so often is. If you looks on my site at the Enterprise Project you'll see my CGI model of her I built is off. Nor a lot but enough to make me go back at some time and correct it. Cracker I usually move pretty fast. But these days I have multiple projects going on between finishing my movie, building RC submarine models for customers, making masks and prosthetic ears I have a full plate. So I divide my time up as best I can. D6 thanks go to my site and look at the big Seaview I did. It's still here the customer is nervous to have it shipped. I don't blame him. Thanks to all of you for the warm welcome and replies it very nice of you all. Steve |
|
|
|
|
|
|
#11 |
|
Join Date: Jun 2009
Posts: 243
![]() |
Re: Studio Half Scale TOS Enterprise Scratch build
Hey Steve, does Jim Davidson ring any bells?? After finishing up with you guys on the VERY small shooting crew we had for Honey Baby I then moved over to the other stage and went to work on the Bat boat / Bat mobile shots. So glad to hear a fellow fx veteran keeping their artistic plates full of great projects!!!
|
|
|
|
|
|
#12 |
|
Re: Studio Half Scale TOS Enterprise Scratch build
Jim it sure does. I remember. I hope you're doing the same. Never give up or give in. There's a lot of cool stuff do do still!
Still working?? Things have really slowed down for me but it just gives me more time to do my own work now. Best of both worlds and I don't have to get up at 5 am anymore. LOL! Steve |
|
|
|
|
|
|
#13 |
|
Re: Studio Half Scale TOS Enterprise Scratch build
Starting to do the bottom side. Using balsa filler to fill gaps and scratches with. Once sanded smooth the glass will lay down nicely. Here’s some pictures from tonights work. I should have the whole saucer sheeted tomorrow. A good friend of mine will be CNCing the smaller parts for me. Good news it should help speed up things a bit.
Steve ![]() ![]()
|
|
|
|
|
|
|
#14 |
|
Join Date: Apr 2005
Posts: 446
![]() |
Re: Studio Half Scale TOS Enterprise Scratch build
I'm liking this build a LOT!!!!!
Plus, NICE mancave!!!
Last edited by BB43MAN; 10-17-2010 at 12:05 AM. Reason: typo |
|
|
|
|
|
#15 |
|
Join Date: Apr 2001
Location: Southern California
Posts: 16,902
![]() ![]() ![]() |
Re: Studio Half Scale TOS Enterprise Scratch build
Damn that looks like fun!
|
|
|
|
|
|
#16 |
|
Modelmaker for Hire
Join Date: Jan 2009
Location: TexASS
Posts: 887
![]() ![]() ![]() |
Re: Studio Half Scale TOS Enterprise Scratch build
Looking great, love to watch a good scratch build.
|
|
|
|
|
|
#17 |
|
Join Date: Feb 2004
Location: Ohio
Posts: 227
![]() |
Re: Studio Half Scale TOS Enterprise Scratch build
She is coming along great so far. Enjoying this build.
|
|
|
|
|
|
#18 |
|
Join Date: Jun 2010
Location: Toronto
Posts: 486
![]() |
Re: Studio Half Scale TOS Enterprise Scratch build
Yeah, watching scratchbuilds is just like watching how a magic trick is done. Steve, that balsa filler is wonderful. Is it a good straight replacement for putty? Off to google it up....
|
|
|
|
|
|
#19 |
|
Join Date: Apr 2001
Location: Southern California
Posts: 16,902
![]() ![]() ![]() |
Re: Studio Half Scale TOS Enterprise Scratch build
This build makes the process of creating the curves of the saucer look very easy.
Can it really be that simple? Or is he just that good! ?
|
|
|
|
|
|
#20 |
|
Re: Studio Half Scale TOS Enterprise Scratch build
Thanks guys. The filler is used for balsa but it sands so easy it matches the foam well. They both sand about the same rate and that's what you want. Once you have the basic shape and contours the whole shape will be epoxy glassed. Then I'll be able to continue on smoothing it with Ever Coat Metal glaze. Much better than Bondo. I never use it anymore. With Ever coat you can point up the shape perfectly and sands easy and smooth. Unlike Bondo. Yuck!
Steve Steve |
|
|
|
|
|
|
#21 |
|
Re: Studio Half Scale TOS Enterprise Scratch build
Nope this process or technique does make it easy. The other way is to wire cut many pis sections, glues them together and sand. A good example of this method is located here on my web site. Welcome To My Website Works very well. I've been selling a book for awhile that documents these techniques: Welcome To My Website
Thanks, Steve |
|
|
|
|
|
|
#23 |
|
Re: Studio Half Scale TOS Enterprise Scratch build
That's the one. I can't model without it.
Steve |
|
|
|
|
|
|
#24 |
|
Join Date: Apr 2001
Location: Southern California
Posts: 16,902
![]() ![]() ![]() |
Re: Studio Half Scale TOS Enterprise Scratch build
I may need to try that. I'm currently using Apoxie Sculpt, but I do not like the way it sands.
|
|
|
|
|
|
#25 |
|
Join Date: Jan 2009
Location: Canada
Posts: 1,674
![]() ![]() |
Re: Studio Half Scale TOS Enterprise Scratch build
Wow! I'll be watching this build with great interest and can't wait to see it done!
Kevin |
|
|
|